Overall Building Size: 188,603 SF

Number of Stories: 6 stories above grade; 7 total levels

Primary Project Team: Turner Construction, Weiss/Manfredi, Tomasetti, Baum&Bolles(B&B),   Heintges, Renfro Design

Dates of Construction: May 2015 – March 2017

Actual Cost Information: Contract Value: Core and Shell - $100 Million

Architecture

  • Co-Location building for student research and company.

  • Open Lobby space and floor space.

  • Contains Classrooms, instructional rooms, lounge areas, multipurpose assembly spaces, offices, and retail space.

electrical

  • Incoming service is provided to a 3000 Amp switchboard at penthouse.

  • 10 Transformers located throughout, with a min of 30KVA to a max 75 KVA.

  • Panel boards are located on 1,3,6 floors providing lighting and receptacles

Mechanical

  • A single 255,000 CFM cooling tower.

  • 3,000 BTU Natural gas, Fire tube boiler at penthouse.

  • Water cooled air-conditioning systems with inlet return air acoustical plenums.

Structural

  • All floors are 5 1/4” reinforced concrete slabs that are tied in with curtain wall system.

  • Minimal columns and beams at lobby and a floors 2 and above.

  • Unique truss system and lateral bracing.

03.29.17      CPEP Final Presentation Outline

01.17.17      CPEP Final Thesis Proposal

11.9.16        CPEP Technical Report 3

10.24.16      CPEP Building Abstract

10.19.16      CPEP Building Statitics Part 2

10.17.16      CPEP Technical Report 2 

10.03.16      CPEP Building Statitics

09.16.16      CPEP Technical Report 1 

09.02.16      CPEP Building Statitics Draft 1

09.01.16      Obtained Project Documentation

09.01.16      Personal Note to Owner

08.29.16      Personal Note to Others

08.27.16      Owner Permission Received

08.24.16      Project Initiation Checklist

NEWS FEED UPDATES

USER NOTE: WHILE GREAT EFFORTS HAVE BEEN TAKEN TO PROVIDE ACCURATE AND COMPLETE INFORMATION ONT HE PAGES OF CPEP, PLEASE BE AWARE THAT THE INFORMATION CONTAINED HEREWITH IS CONSIDERED A WORK-IN-PROGRESS FOR THIS THESIS PROJECT.  MODIFICATIONS AND CHANGES RELATED TO THE ORIGINAL BUILDING DESIGNS AND CONSTRUCTION METHODOLOGIES FOR THIS SENIOR THESIS PROJECT ARE SOLELY THE INTERPRETATION OF CHRIISTOPHER LINTON. CHANGES AND DISCREPENCIES IN NO WAY IMPLY THAT THE ORIGINAL DESIGN CONTAINED ERRORS OR WAS FLAWED.  DIFFERING ASSUMPTIONS, CODE REFERENCES, REQUIREMENTS, AND METHODOLOGIES HAVE BEEN INCORPORATED INTO THIS THESIS PROJECT, THEREFORE, INVESTIGATION RESULTS MAY VARY FROM THE ORIGINAL DESIGN.

 