Weiler House
San Francisco
Christopher Linton
Construction Management
Abstract





Statistics
Overall Building Size: 188,603 SF
Number of Stories: 6 stories above grade; 7 total levels
Primary Project Team: Turner Construction, Weiss/Manfredi, Tomasetti, Baum&Bolles(B&B), Heintges, Renfro Design
Dates of Construction: May 2015 – March 2017
Actual Cost Information: Contract Value: Core and Shell - $100 Million
Architecture
-
Co-Location building for student research and company.
-
Open Lobby space and floor space.
-
Contains Classrooms, instructional rooms, lounge areas, multipurpose assembly spaces, offices, and retail space.
electrical
-
Incoming service is provided to a 3000 Amp switchboard at penthouse.
-
10 Transformers located throughout, with a min of 30KVA to a max 75 KVA.
-
Panel boards are located on 1,3,6 floors providing lighting and receptacles
Mechanical
-
A single 255,000 CFM cooling tower.
-
3,000 BTU Natural gas, Fire tube boiler at penthouse.
-
Water cooled air-conditioning systems with inlet return air acoustical plenums.
Structural
-
All floors are 5 1/4” reinforced concrete slabs that are tied in with curtain wall system.
-
Minimal columns and beams at lobby and a floors 2 and above.
-
Unique truss system and lateral bracing.